PLAN ID: EKC-STR-006Industrial & Steel Structures • Structural Steel Portal FrameEurocode 3 (EN 1993-1-1) & BS 5950 (Steelwork)

TitanSpan 2,400 SQM Structural Steel Portal Frame Warehouse & Office

Clear-Span Industrial Warehouse + 2-Storey RC Admin Block • Industrial Parks & Logistics Corridors (3,500+ sqm Land)

Standard Turnkey Build~₦225K/m²
NGN 540,000,000
NGN₦540.0M
USD$346K
GBP£270K
EUR€319K
TitanSpan 2,400 SQM Structural Steel Portal Frame Warehouse & Office
C35/45 Steel-Fibre Reinforced Concrete Industrial Floor Slab (225mm Thick, 50 kN/m² Uniform Load)
Visual 1 of 2
GROSS FLOOR / PLOT AREA2400 sqm / 4000 sqm
STRUCTURAL LEVELS9.5m Eaves Clear-Span Warehouse + 2-Storey Office Mezzanine
REBAR & CONCRETE BOQ142.0T • 780m³
EST. BUILD DURATION32 – 40 Weeks (8–10 Months)
COREN Structural Engineering Schedule • EKC-STR-006

Complete 12-Point Structural & Civil Specifications

Heavy-duty 30m clear-span × 80m long structural steel portal frame warehouse and factory facility with a 2-storey reinforced concrete administrative office annex, overhead crane corbel provision (10-Tonne Gantry capacity), and laser-screeded fibre-reinforced industrial floor slab.

01. Structural Frame System

30m Clear-Span Hot-Rolled S355JR Structural Steel Portal Frame (6.0m Bay Spacing) + RC Admin Frame

02. Governing Design Codes

Eurocode 3 (EN 1993-1-1) & BS 5950 (Steelwork) | TR34 Industrial Ground Floor Code

03. Substructure & Foundation System

Heavy-Duty Reinforced Concrete Pad Footings (2.4m × 2.4m) with Grade 8.8 HD Holding-Down Anchor Bolts

04. Concrete Strength Grade

C35/45 Steel-Fibre Reinforced Concrete Industrial Floor Slab (225mm Thick, 50 kN/m² Uniform Load)

05. Reinforcement Steel Specification

S355 Universal Columns (UC 305×305×118) & Universal Beams (UB 533×210×92) + Cold-Formed Z-Purlins

06. Suspended Floor Slab System

225mm Power-Floated C35/45 Industrial Ground Slab with Saw-Cut Contraction Joints & Epoxy Seal

07. Column Grid & Section Sizes

30.0m Clear Span (Zero Internal Columns) × 6.0m Longitudinal Portal Bays (13 Bays = 78m)

08. Primary & Cantilever Beam Specs

Haunched UB 533×210×92 Portal Rafters + Gantry Crane Runway Brackets at 7.0m Height

09. Blockwork & Shear-Wall System

2.4m High 225mm RC/Blockwork Dado Wall + 0.55mm Insulated Aluzinc Cladding Panels & Polycarbonate Skylights

10. Roof Trusses & Parapet Drainage

Pitched Structural Steel Portal Rafters (6° Pitch) + Z200 Galvanized Purlins + 0.70mm Industrial Aluzinc Sheets

11. Required Soil Bearing Capacity

Minimum 150 kN/m² | CBR > 15% Engineered Sub-Base under Warehouse Floor

12. Wind Load & Factor of Safety

Wind Bracing in End Bays, Roof Plan & Eaves Struts | 2-Coat Zinc-Phosphate Anti-Corrosion Paint

Lead Structural Engineer

Engr. Chibuike Ekeson, FNSE, COREN

Principal Civil & Structural Engineer

EST. BUILD PRICE:NGN 540,000,000
Direct WhatsApp Engineering Quote Preview

“Hello Engr. Ekeson & Ekesonconstruct Civil Engineering Desk, I inspected the full structural details for "TitanSpan 2,400 SQM Structural Steel Portal Frame Warehouse & Office" [Plan ID: EKC-STR-006]. Selected Scope: Standard Turnkey Build | Soil Profile: Firm Laterite Soil (Pad/Strip Baseline) | Website Estimated Build Cost: NGN 540,000,000. Please share the itemized BOQ and mobilization schedule for my land.”

Ask Exact Price to Build on WhatsAppCall Lead Engineer: +234 800 353 7662
Other Pre-Engineered Building Structures

Explore More Building Types & Structural Plans

The Sovereign Crest 6-Bedroom Triplex Mansion Structure
PLAN: EKC-STR-001Duplex & Villa Structures

Full Move-In Cost (Painted & Tiled)

NGN 285,000,000

Full Breakdown
Triplex Villa Structure (G + 2 Floors + Penthouse)COREN Approved
The Sovereign Crest 6-Bedroom Triplex Mansion Structure

A state-of-the-art 3-storey reinforced concrete residential structure engineered with a 3.8m dramatic front cantilever, double-height void over the main ante-room, reinforced concrete lift shaft for a residential glass elevator, infinity pool structural shell, and 3-room detached BQ.

01. CEMENT & BLOCKS4,250 Bags • 28,500 Blks
02. IRON RODS (STEEL)64.5 Tonnes Rods
03. RECOMMENDED LANDMin. 900 sqm Plot
04. FOUNDATION TYPEReinforced Concrete Raft Foundation
6 Beds • 920m² Floor
40 – 48 Weeks (10–12 Months)
Pay Stage-by-Stage (5 Phases)Drawings + BOQ: ₦3.8M
View PlanWhatsApp
The Aurelia 5-Bedroom Contemporary Cantilevered Duplex Plan
PLAN: EKC-STR-002Duplex & Villa Structures

Full Move-In Cost (Painted & Tiled)

NGN 145,000,000

Full Breakdown
Detached Duplex Structure (G + 1 Floor)COREN Approved
The Aurelia 5-Bedroom Contemporary Cantilevered Duplex Plan

Our most popular 5-bedroom detached duplex structure designed to fit a standard 500–600 sqm plot with ample parking for 5 cars, a 2-room attached BQ, floating reinforced concrete staircase, floor-to-ceiling thermal glass panels, and hidden RC roof gutter slab.

01. CEMENT & BLOCKS2,350 Bags • 15,800 Blks
02. IRON RODS (STEEL)29.8 Tonnes Rods
03. RECOMMENDED LANDMin. 500 sqm Plot
04. FOUNDATION TYPEReinforced Concrete Pad & Strip Footings
5 Beds • 480m² Floor
28 – 36 Weeks (7–9 Months)
Pay Stage-by-Stage (5 Phases)Drawings + BOQ: ₦2.2M
View PlanWhatsApp
Concordia 8-Unit Multi-Storey Apartment Block (G + 3 Floors)
PLAN: EKC-STR-003Multi-Storey Apartment Blocks

Full Move-In Cost (Painted & Tiled)

NGN 420,000,000

Full Breakdown
4-Storey Block of Flats (8 × 3-Bedroom Apartments)COREN Approved
Concordia 8-Unit Multi-Storey Apartment Block (G + 3 Floors)

A high-density, structurally robust 4-storey residential block comprising eight (8) spacious 3-bedroom apartments (2 flats per floor), central passenger elevator core, dual fire-rated escape staircases, and ground-level parking bays.

01. CEMENT & BLOCKS7,600 Bags • 48,000 Blks
02. IRON RODS (STEEL)118.0 Tonnes Rods
03. RECOMMENDED LANDMin. 1000 sqm Plot
04. FOUNDATION TYPECellular Reinforced Concrete Raft Foundation
24 Beds • 1680m² Floor
48 – 60 Weeks (12–15 Months)
Pay Stage-by-Stage (5 Phases)Drawings + BOQ: ₦5.5M