EKECONSTRUCTNIGERIA
2
Back to Building Structures Catalog
PLAN ID: EKC-STR-008Commercial & Office Structures • Healthcare & Institutional RC FrameEurocode 2 & HTM (Health Technical Memoranda) Structural Standards

MedCore 50-Bed Specialist Hospital & Diagnostic Center Structure

3-Storey Healthcare & Medical Facility Structure • Fits 1,500–2,500 sqm Institutional Plots

Standard Turnkey Build~₦267K/m²
NGN 520,000,000
NGN₦520.0M
USD$333K
GBP£260K
EUR€307K
MedCore 50-Bed Specialist Hospital & Diagnostic Center Structure
C35/45 High-Density Concrete (350mm Thick Walls around Radiology)
Visual 1 of 2
GROSS FLOOR / PLOT AREA1950 sqm / 1800 sqm
STRUCTURAL LEVELS3 Levels (Ground Emergency/Radiology + 1st Surgical/ICU + 2nd In-Patient Wards)
REBAR & CONCRETE BOQ136.0T • 1,050m³
EST. BUILD DURATION48 – 60 Weeks (12–15 Months)
COREN Structural Engineering Schedule • EKC-STR-008

Complete 12-Point Structural & Civil Specifications

Purpose-engineered 3-storey medical and diagnostic complex featuring high-density concrete radiation shielding for CT/X-Ray rooms, vibration-isolated surgical theatre slabs, wide hospital stretcher elevator core, and structural emergency ramp.

01. Structural Frame System

Heavy-Duty Reinforced Concrete Frame with Radiation-Shielded Bunkers & Anti-Vibration Theatre Slabs

02. Governing Design Codes

Eurocode 2 & HTM (Health Technical Memoranda) Structural Standards | Live Load: 5.0 kN/m²

03. Substructure & Foundation System

Reinforced Concrete Raft Foundation (1,000mm Deep) + Isolated Equipment Plinths for MRI/CT Scanners

04. Concrete Strength Grade

C35/45 High-Density Concrete (350mm Thick Walls around Radiology) | C30/37 Superstructure

05. Reinforcement Steel Specification

High-Yield TMT Bars fy = 500 N/mm² (Y16, Y20, Y25)

06. Suspended Floor Slab System

225mm Thick Solid RC Slabs to Eliminate Footfall Vibration in Operating Theatres & ICU

07. Column Grid & Section Sizes

7.2m × 7.2m Hospital Corridor Module (2.4m Clear Stretcher Corridors)

08. Primary & Cantilever Beam Specs

300×600mm Main Beams with Sleeved MEP Service Penetrations for Medical Gas & HVAC Ducts

09. Blockwork & Shear-Wall System

350mm Barytes/High-Density Concrete Walls (Radiology) + 225mm Anti-Bacterial Rendered Blockwork

10. Roof Trusses & Parapet Drainage

Reinforced Concrete Roof Deck + Steel Truss Over-Roof for Medical Gas & Chiller Plant Protection

11. Required Soil Bearing Capacity

Minimum 150 kN/m²

12. Wind Load & Factor of Safety

Importance Factor γI = 1.4 (Critical Healthcare Infrastructure Class)

Lead Structural Engineer

Engr. Chibuike Ekeson, FNSE, COREN

Principal Civil & Structural Engineer

EST. BUILD PRICE:NGN 520,000,000
Direct WhatsApp Engineering Quote Preview

“Hello Engr. Ekeson & Ekesonconstruct Civil Engineering Desk, I inspected the full structural details for "MedCore 50-Bed Specialist Hospital & Diagnostic Center Structure" [Plan ID: EKC-STR-008]. Selected Scope: Standard Turnkey Build | Soil Profile: Firm Laterite Soil (Pad/Strip Baseline) | Website Estimated Build Cost: NGN 520,000,000. Please share the itemized BOQ and mobilization schedule for my land.”

Ask Exact Price to Build on WhatsAppCall Lead Engineer: +234 800 353 7662
Other Pre-Engineered Building Structures

Explore More Building Types & Structural Plans

Emerald Atrium 6-Storey Grade-A Commercial Office Structure
PLAN: EKC-STR-004Commercial & Office Structures

Full Move-In Cost (Painted & Tiled)

NGN 780,000,000

Full Breakdown
6-Storey Commercial Office Building (Column-Free Floor Plates)COREN Approved
Emerald Atrium 6-Storey Grade-A Commercial Office Structure

A state-of-the-art 6-storey commercial office structure engineered with 9.0m × 9.0m wide-span ribbed waffle slabs to deliver open, column-free corporate floor plates, structural curtain-wall glazing anchors, twin elevator shafts, and basement/ground parking.

01. CEMENT & BLOCKS13,200 Bags • 22,000 Blks
02. IRON RODS (STEEL)235.0 Tonnes Rods
03. RECOMMENDED LANDMin. 1500 sqm Plot
04. FOUNDATION TYPEDeep Bored Concrete Piles
2850m² Floor
60 – 76 Weeks (15–18 Months)
Pay Stage-by-Stage (5 Phases)Drawings + BOQ: ₦9.5M
View PlanWhatsApp
The Sovereign Crest 6-Bedroom Triplex Mansion Structure
PLAN: EKC-STR-001Duplex & Villa Structures

Full Move-In Cost (Painted & Tiled)

NGN 285,000,000

Full Breakdown
Triplex Villa Structure (G + 2 Floors + Penthouse)COREN Approved
The Sovereign Crest 6-Bedroom Triplex Mansion Structure

A state-of-the-art 3-storey reinforced concrete residential structure engineered with a 3.8m dramatic front cantilever, double-height void over the main ante-room, reinforced concrete lift shaft for a residential glass elevator, infinity pool structural shell, and 3-room detached BQ.

01. CEMENT & BLOCKS4,250 Bags • 28,500 Blks
02. IRON RODS (STEEL)64.5 Tonnes Rods
03. RECOMMENDED LANDMin. 900 sqm Plot
04. FOUNDATION TYPEReinforced Concrete Raft Foundation
6 Beds • 920m² Floor
40 – 48 Weeks (10–12 Months)
Pay Stage-by-Stage (5 Phases)Drawings + BOQ: ₦3.8M
View PlanWhatsApp
The Aurelia 5-Bedroom Contemporary Cantilevered Duplex Plan
PLAN: EKC-STR-002Duplex & Villa Structures

Full Move-In Cost (Painted & Tiled)

NGN 145,000,000

Full Breakdown
Detached Duplex Structure (G + 1 Floor)COREN Approved
The Aurelia 5-Bedroom Contemporary Cantilevered Duplex Plan

Our most popular 5-bedroom detached duplex structure designed to fit a standard 500–600 sqm plot with ample parking for 5 cars, a 2-room attached BQ, floating reinforced concrete staircase, floor-to-ceiling thermal glass panels, and hidden RC roof gutter slab.

01. CEMENT & BLOCKS2,350 Bags • 15,800 Blks
02. IRON RODS (STEEL)29.8 Tonnes Rods
03. RECOMMENDED LANDMin. 500 sqm Plot
04. FOUNDATION TYPEReinforced Concrete Pad & Strip Footings
5 Beds • 480m² Floor
28 – 36 Weeks (7–9 Months)
Pay Stage-by-Stage (5 Phases)Drawings + BOQ: ₦2.2M
View PlanWhatsApp